Sketch map of Larissa

New builds in Kileler

41 new-build permits in Kileler in the past 12 months, 3 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Kileler are down 40% on the same period last year.

26 permits between 13 October 2026 and 11 November 2026, against 43 in the same weeks a year earlier.

Also

  • Kileler ranks 2nd out of 7 municipalities in Larissa for new-build permits over the past 12 months.

    41 permits, 10% of the total in Larissa.

The numbers in Kileler

New-build permits, 30 days
3
New-build permits, 12 months
41
New builds with 3+ floors
3
New permits with a pool
1
New floor area (m²)
12,810
Building permits, 7 days
7
Building permits, 30 days
26
Building permits, 12 months
511

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 88Nov2025Dec 2025: 8DecJan 2026: 2Jan2026Feb 2026: 3FebMar 2026: 0MarApr 2026: 4AprMay 2026: 1MayJun 2026: 4JunJul 2026: 6JulAug 2026: 0AugSep 2026: 6SepOct 2026: 33OctNov 2026: 0 (month to date)0Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds41
  • Small-scale works391
  • Revisions60
  • Pre-approvals19

What is being built in Kileler

Over the past 12 months, 41 new-build permits were issued in Kileler, out of 511 building permits of all types (including small-scale works, revisions and pre-approvals). That is 16% fewer than in the previous 12 months (49). Together they add 12,810 m² of new floor area (counting the 30 permits that state it).

Low-rise dominates: only 9% of the new buildings have three or more floors. The average new build has 427 m² of new floor area and 1.6 floors, against 412 m² in Larissa.

Kileler accounts for 10% of new builds in Larissa and ranks 2nd of 7 municipalities.

Where Kileler stands

#12 months30 days
1Larissa24224
2Kileler413
3Tyrnavo364

The latest permits in Kileler

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
30 October 2026New buildKileler12,546—
23 October 2026New buildKileler—54Offices, Temporary accommodation
20 October 2026New buildKileler129Offices
5 October 2026Pre-approvalKileler—8,334—
1 October 2026Pre-approvalKileler523,886Industry and manufacturing
30 September 2026New buildKileler1585—
17 September 2026New buildKileler1118Residential
16 September 2026Pre-approvalKileler3600—
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

3 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Larissa

Windows and doors

41 new builds and 12,810 m² of new floor area. Every one of them will need windows and doors.

All of Larissa

Swimming pools

1 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Larissa

Building materials

12,810 m² of new floor area in 41 permits: where cement, bricks and steel will be needed.

All of Larissa

Electricians and solar

41 new builds and 391 small-scale works, from refurbishments to solar panels.

All of Larissa

Frequently asked questions

How many new-build permits were issued in Kileler in 2026?

29 from 1 January to 13 November 2026. In the same period of 2025 there were 43, and 55 in the whole of 2025.

How many new apartment buildings are going up in Kileler?

In the past 12 months, 3 new-build permits were for buildings with three or more floors, 1 of them with four or more. We count the 32 of 41 permits that state the number of floors.

How does Kileler compare with other municipalities in Larissa?

It ranks 2nd of 7 for new-build permits over the past 12 months, with 10% of the total. The top three are Larissa (242), Kileler (41), Tyrnavo (36).

How many new permits with a swimming pool were issued in Kileler?

1 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Kileler for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Kileler was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Kileler: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy