Sketch map of Larissa

New buildings with three or more floors in Larissa

For lift companies: every new build with three or more floors, as soon as its permit is issued, long before the shaft is built.

Updated: (latest permit)

Live finding · 13 November 2026

130 new buildings with 3+ floors, past 12 months in Larissa.

In the past 12 months, 130 new-build permits in Larissa were for buildings with three or more floors, 86 of them with four or more; 7 buildings with four or more floors were permitted in the last 30 days. The lift is decided during design, so the engineer on the permit is the person to talk to.

Also

  • New-build permits in Larissa are down 18% on the same period last year.

    36 permits between 13 October 2026 and 11 November 2026, against 44 in the same weeks a year earlier.

The numbers in Larissa

New-build permits, 30 days
35
New-build permits, 12 months
401
New builds with 3+ floors
130
New permits with a pool
10
New floor area (m²)
131,006
Building permits, 7 days
75
Building permits, 30 days
415
Building permits, 12 months
6,228

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 46Nov2025Dec 2025: 37DecJan 2026: 24Jan2026Feb 2026: 25FebMar 2026: 22MarApr 2026: 35AprMay 2026: 29MayJun 2026: 40JunJul 2026: 39JulAug 2026: 21AugSep 2026: 4848SepOct 2026: 4040OctNov 2026: 12 (month to date)12Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds401
  • Small-scale works5,087
  • Revisions636
  • Pre-approvals104

What is being built in Larissa

In the past 12 months, 130 new-build permits in Larissa were for buildings with three or more floors, 86 of them with four or more; 7 buildings with four or more floors were permitted in the last 30 days. The lift is decided during design, so the engineer on the permit is the person to talk to.

Over the past 12 months, 401 new-build permits were issued in Larissa, out of 6,228 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (424). Together they add 131,006 m² of new floor area (counting the 318 permits that state it).

Mid-rise is the norm here: 41% of the new buildings have three or more floors. The average new build has 412 m² of new floor area and 2.7 floors, against 322 m² in Greece as a whole. 10 of the new-build permits are for holiday accommodation (hotels, rooms to let). 5 include a swimming pool (1%).

Larissa accounts for 2% of all new builds in Greece and ranks 16th of 51 prefectures. The municipalities with the most new builds were Larissa (242), Kileler (41) and Tyrnavo (36).

Municipalities with the most new builds

#12 months30 days
1Larissa24224
2Kileler413
3Tyrnavo364
4Elassona293
5Tebon240
6Farsalon161
7Agia130

The latest permits in Larissa

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
11 November 2026New buildLarissa6752Temporary accommodation, Residential
11 November 2026New buildLarissa2173Residential
11 November 2026New buildLarissa—104—
11 November 2026Pre-approvalTebon2443Industry and manufacturing
10 November 2026New buildLarissa4299—
10 November 2026New buildLarissa—207Residential
10 November 2026New buildLarissa1118Residential
10 November 2026New buildLarissa3680Residential
address & engineer — in Bouldoza

Who it's for

Windows and doors

401 new builds and 131,006 m² of new floor area. Every one of them will need windows and doors.

See the sector

Swimming pools

10 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Building materials

131,006 m² of new floor area in 401 permits: where cement, bricks and steel will be needed.

See the sector

Electricians and solar

401 new builds and 5,087 small-scale works, from refurbishments to solar panels.

See the sector

Frequently asked questions

How many new-build permits were issued in Larissa in 2026?

335 from 1 January to 13 November 2026. In the same period of 2025 there were 361, and 427 in the whole of 2025.

How many new apartment buildings are going up in Larissa?

In the past 12 months, 130 new-build permits were for buildings with three or more floors, 86 of them with four or more. We count the 315 of 401 permits that state the number of floors.

Which municipalities in Larissa have the most new builds?

Over the past 12 months: 1. Larissa (242), 2. Kileler (41), 3. Tyrnavo (36), 4. Elassona (29), 5. Tebon (24).

How many new permits with a swimming pool were issued in Larissa?

10 in the past 12 months (new builds and small-scale works), 1 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Larissa for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Larissa was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Larissa: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy