Sketch map of Elis

New builds in Pineio

18 new-build permits in Pineio in the past 12 months, 0 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Pineio are down 25% on the same period last year.

12 permits between 13 October 2026 and 11 November 2026, against 16 in the same weeks a year earlier.

The numbers in Pineio

New-build permits, 30 days
0
New-build permits, 12 months
18
New builds with 3+ floors
0
New permits with a pool
3
New floor area (m²)
4,948
Building permits, 7 days
0
Building permits, 30 days
11
Building permits, 12 months
134

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 0Nov2025Dec 2025: 0DecJan 2026: 33Jan2026Feb 2026: 1FebMar 2026: 2MarApr 2026: 0AprMay 2026: 2MayJun 2026: 2JunJul 2026: 3JulAug 2026: 2AugSep 2026: 3SepOct 2026: 00OctNov 2026: 0 (month to date)0Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds18
  • Small-scale works90
  • Revisions25
  • Pre-approvals1

What is being built in Pineio

Over the past 12 months, 18 new-build permits were issued in Pineio, out of 134 building permits of all types (including small-scale works, revisions and pre-approvals). Together they add 4,948 m² of new floor area (counting the 14 permits that state it).

Low-rise dominates: only 0% of the new buildings have three or more floors. The average new build has 353 m² of new floor area and 1.3 floors, against 251 m² in Elis.

Pineio accounts for 8% of new builds in Elis and ranks 5th of 7 municipalities.

Where Pineio stands

#12 months30 days
1Pyrgos635
2Ilida445
3Andravida-Kyllini422
5Andritsaina-Krestenon181
5Pineio180
7Archaia Olybia151

The latest permits in Pineio

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
23 September 2026New buildPineio—144—
18 September 2026New buildPineio———
16 September 2026New buildPineio2117Residential
14 August 2026New buildPineio—136—
13 August 2026New buildPineio1356—
15 July 2026New buildPineio—88Pool
11 July 2026New buildPineio264Residential
10 July 2026New buildPineio12,869Industry and manufacturing
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

0 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Elis

Windows and doors

18 new builds and 4,948 m² of new floor area. Every one of them will need windows and doors.

All of Elis

Swimming pools

3 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Elis

Building materials

4,948 m² of new floor area in 18 permits: where cement, bricks and steel will be needed.

All of Elis

Electricians and solar

18 new builds and 90 small-scale works, from refurbishments to solar panels.

All of Elis

Frequently asked questions

How many new-build permits were issued in Pineio in 2026?

18 from 1 January to 13 November 2026. In the same period of 2025 there were 7, and 7 in the whole of 2025.

How many new apartment buildings are going up in Pineio?

In the past 12 months, 0 new-build permits were for buildings with three or more floors, 0 of them with four or more. We count the 14 of 18 permits that state the number of floors.

How does Pineio compare with other municipalities in Elis?

It ranks 5th of 7 for new-build permits over the past 12 months, with 8% of the total. The top three are Pyrgos (63), Ilida (44), Andravida-Kyllini (42).

How many new permits with a swimming pool were issued in Pineio?

3 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Pineio for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Pineio was issued on 6 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Pineio: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy