New builds in Ilida

44 new-build permits in Ilida in the past 12 months, 5 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Ilida are down 35% on the same period last year.

26 permits between 13 October 2026 and 11 November 2026, against 40 in the same weeks a year earlier.

Also

  • Ilida ranks 2nd out of 7 municipalities in Elis for new-build permits over the past 12 months.

    44 permits, 19% of the total in Elis.

The numbers in Ilida

New-build permits, 30 days
5
New-build permits, 12 months
44
New builds with 3+ floors
6
New permits with a pool
1
New floor area (m²)
7,239
Building permits, 7 days
2
Building permits, 30 days
24
Building permits, 12 months
288

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 55Nov2025Dec 2025: 5DecJan 2026: 2Jan2026Feb 2026: 1FebMar 2026: 5MarApr 2026: 5AprMay 2026: 4MayJun 2026: 5JunJul 2026: 5JulAug 2026: 2AugSep 2026: 3SepOct 2026: 33OctNov 2026: 2 (month to date)2Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds44
  • Small-scale works212
  • Revisions30
  • Pre-approvals2

What is being built in Ilida

Over the past 12 months, 44 new-build permits were issued in Ilida, out of 288 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (46). Together they add 7,239 m² of new floor area (counting the 28 permits that state it).

15% of the new buildings have three or more floors. The average new build has 259 m² of new floor area and 1.7 floors, against 251 m² in Elis.

Ilida accounts for 19% of new builds in Elis and ranks 2nd of 7 municipalities.

Where Ilida stands

#12 months30 days
1Pyrgos635
2Ilida445
3Andravida-Kyllini422

The latest permits in Ilida

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
7 November 2026New buildIlida4238Residential, Storage
3 November 2026New buildIlida256Residential
26 October 2026New buildIlida2217Retail and commerce
22 October 2026New buildIlida—36—
19 October 2026Pre-approvalIlida2783Public assembly, Temporary accommodation
16 October 2026New buildIlida390Residential
11 September 2026New buildIlida297Residential
7 September 2026New buildIlida215Storage, Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

6 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Elis

Windows and doors

44 new builds and 7,239 m² of new floor area. Every one of them will need windows and doors.

All of Elis

Swimming pools

1 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Elis

Building materials

7,239 m² of new floor area in 44 permits: where cement, bricks and steel will be needed.

All of Elis

Electricians and solar

44 new builds and 212 small-scale works, from refurbishments to solar panels.

All of Elis

Frequently asked questions

How many new-build permits were issued in Ilida in 2026?

37 from 1 January to 13 November 2026. In the same period of 2025 there were 38, and 45 in the whole of 2025.

How many new apartment buildings are going up in Ilida?

In the past 12 months, 6 new-build permits were for buildings with three or more floors, 4 of them with four or more. We count the 39 of 44 permits that state the number of floors.

How does Ilida compare with other municipalities in Elis?

It ranks 2nd of 7 for new-build permits over the past 12 months, with 19% of the total. The top three are Pyrgos (63), Ilida (44), Andravida-Kyllini (42).

How many new permits with a swimming pool were issued in Ilida?

1 in the past 12 months (new builds and small-scale works), 1 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Ilida for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Ilida was issued on 11 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Ilida: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy