Sketch map of Drama

New builds in Drama for window and door makers

Window and door orders are placed months after the permit. Knowing the permit first gives you that head start.

Updated: (latest permit)

Live finding · 13 November 2026

114 new-build permits, past 12 months in Drama.

114 new-build permits were issued in Drama in the past 12 months, with 27,271 m² of new floor area, plus 201 revisions of existing permits. 8 new builds were added in the last 30 days.

Also

  • Building permits of all types in Drama are down 34% on the same period last year.

    66 permits between 13 October 2026 and 11 November 2026, against 100 in the same weeks a year earlier.

The numbers in Drama

New-build permits, 30 days
8
New-build permits, 12 months
114
New builds with 3+ floors
11
New permits with a pool
1
New floor area (m²)
27,271
Building permits, 7 days
11
Building permits, 30 days
57
Building permits, 12 months
1,354

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 12Nov2025Dec 2025: 7DecJan 2026: 4Jan2026Feb 2026: 8FebMar 2026: 10MarApr 2026: 12AprMay 2026: 11MayJun 2026: 6JunJul 2026: 8JulAug 2026: 1313AugSep 2026: 13SepOct 2026: 99OctNov 2026: 5 (month to date)5Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds114
  • Small-scale works1,036
  • Revisions201
  • Pre-approvals3

What is being built in Drama

114 new-build permits were issued in Drama in the past 12 months, with 27,271 m² of new floor area, plus 201 revisions of existing permits. 8 new builds were added in the last 30 days.

Over the past 12 months, 114 new-build permits were issued in Drama, out of 1,354 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (124). Together they add 27,271 m² of new floor area (counting the 80 permits that state it).

Low-rise dominates: only 14% of the new buildings have three or more floors. The average new build has 341 m² of new floor area and 1.8 floors, against 322 m² in Greece as a whole.

Drama accounts for 0.6% of all new builds in Greece and ranks 42nd of 51 prefectures. The municipalities with the most new builds were Drama (73), Doxato (18) and Prosotsani (17).

Municipalities with the most new builds

#12 months30 days
1Drama737
2Doxato181
3Prosotsani170
4Kato Nevrokopio40
5Paranestio20

The latest permits in Drama

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
11 November 2026New buildDrama121—
9 November 2026New buildDrama1182—
9 November 2026New buildDrama2421Residential
9 November 2026New buildDrama153Residential
2 November 2026New buildDrama———
30 October 2026New buildDrama51,008—
27 October 2026New buildDrama164—
26 October 2026New buildDoxato—207Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

11 new buildings with three or more floors in the past year: the likeliest customers for a lift.

See the sector

Swimming pools

1 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Building materials

27,271 m² of new floor area in 114 permits: where cement, bricks and steel will be needed.

See the sector

Electricians and solar

114 new builds and 1,036 small-scale works, from refurbishments to solar panels.

See the sector

Frequently asked questions

How many new-build permits were issued in Drama in 2026?

99 from 1 January to 13 November 2026. In the same period of 2025 there were 111, and 126 in the whole of 2025.

How many new apartment buildings are going up in Drama?

In the past 12 months, 11 new-build permits were for buildings with three or more floors, 7 of them with four or more. We count the 79 of 114 permits that state the number of floors.

Which municipalities in Drama have the most new builds?

Over the past 12 months: 1. Drama (73), 2. Doxato (18), 3. Prosotsani (17), 4. Kato Nevrokopio (4), 5. Paranestio (2).

How many new permits with a swimming pool were issued in Drama?

1 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Drama for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Drama was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Drama: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy