Sketch map of Drama

New builds in Doxato

18 new-build permits in Doxato in the past 12 months, 1 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Doxato are down 35% on the same period last year.

15 permits between 13 October 2026 and 11 November 2026, against 23 in the same weeks a year earlier.

Also

  • Doxato ranks 2nd out of 5 municipalities in Drama for new-build permits over the past 12 months.

    18 permits, 16% of the total in Drama.

The numbers in Doxato

New-build permits, 30 days
1
New-build permits, 12 months
18
New builds with 3+ floors
0
New permits with a pool
0
New floor area (m²)
842
Building permits, 7 days
1
Building permits, 30 days
11
Building permits, 12 months
170

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 2Nov2025Dec 2025: 33DecJan 2026: 0Jan2026Feb 2026: 1FebMar 2026: 1MarApr 2026: 1AprMay 2026: 3MayJun 2026: 1JunJul 2026: 2JulAug 2026: 1AugSep 2026: 1SepOct 2026: 33OctNov 2026: 0 (month to date)0Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds18
  • Small-scale works140
  • Revisions12
  • Pre-approvals0

What is being built in Doxato

Over the past 12 months, 18 new-build permits were issued in Doxato, out of 170 building permits of all types (including small-scale works, revisions and pre-approvals). That is 44% fewer than in the previous 12 months (32). Together they add 842 m² of new floor area (counting the 11 permits that state it).

Low-rise dominates: only 0% of the new buildings have three or more floors. The average new build has 77 m² of new floor area and 1.3 floors, against 341 m² in Drama.

Doxato accounts for 16% of new builds in Drama and ranks 2nd of 5 municipalities.

Where Doxato stands

#12 months30 days
1Drama737
2Doxato181
3Prosotsani170

The latest permits in Doxato

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
26 October 2026New buildDoxato—207Residential
13 October 2026New buildDoxato160Storage, Residential
1 October 2026New buildDoxato2342Residential, Storage
1 September 2026New buildDoxato130Residential
24 August 2026New buildDoxato197Storage
22 July 2026New buildDoxato1124Industry and manufacturing
3 July 2026New buildDoxato—122Residential
22 June 2026New buildDoxato167Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

0 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Drama

Windows and doors

18 new builds and 842 m² of new floor area. Every one of them will need windows and doors.

All of Drama

Swimming pools

0 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Drama

Building materials

842 m² of new floor area in 18 permits: where cement, bricks and steel will be needed.

All of Drama

Electricians and solar

18 new builds and 140 small-scale works, from refurbishments to solar panels.

All of Drama

Frequently asked questions

How many new-build permits were issued in Doxato in 2026?

14 from 1 January to 13 November 2026. In the same period of 2025 there were 30, and 34 in the whole of 2025.

How many new apartment buildings are going up in Doxato?

In the past 12 months, 0 new-build permits were for buildings with three or more floors, 0 of them with four or more. We count the 14 of 18 permits that state the number of floors.

How does Doxato compare with other municipalities in Drama?

It ranks 2nd of 5 for new-build permits over the past 12 months, with 16% of the total. The top three are Drama (73), Doxato (18), Prosotsani (17).

How many new permits with a swimming pool were issued in Doxato?

0 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Doxato for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Doxato was issued on 11 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Doxato: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy