Sketch map of Rhodope

New builds in Maroneia-Sapon

30 new-build permits in Maroneia-Sapon in the past 12 months, 0 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

No new-build permits in Maroneia-Sapon in the last 30 days, but 5 other building permits.

Mostly small-scale works and revisions. New builds in the past 12 months: 30.

The numbers in Maroneia-Sapon

New-build permits, 30 days
0
New-build permits, 12 months
30
New builds with 3+ floors
0
New permits with a pool
1
New floor area (m²)
5,147
Building permits, 7 days
1
Building permits, 30 days
5
Building permits, 12 months
142

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 0Nov2025Dec 2025: 4DecJan 2026: 2Jan2026Feb 2026: 2FebMar 2026: 2MarApr 2026: 66AprMay 2026: 2MayJun 2026: 4JunJul 2026: 0JulAug 2026: 3AugSep 2026: 4SepOct 2026: 11OctNov 2026: 0 (month to date)0Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds30
  • Small-scale works85
  • Revisions25
  • Pre-approvals2

What is being built in Maroneia-Sapon

Over the past 12 months, 30 new-build permits were issued in Maroneia-Sapon, out of 142 building permits of all types (including small-scale works, revisions and pre-approvals). That is 14% fewer than in the previous 12 months (35). Together they add 5,147 m² of new floor area.

Low-rise dominates: only 0% of the new buildings have three or more floors. The average new build has 172 m² of new floor area and 1.3 floors, against 262 m² in Rhodope.

Maroneia-Sapon accounts for 21% of new builds in Rhodope and ranks 2nd of 4 municipalities.

Where Maroneia-Sapon stands

#12 months30 days
1Komotini8910
2Maroneia-Sapon300
3Iasmo202

The latest permits in Maroneia-Sapon

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
20 October 2026Pre-approvalMaroneia-Sapon2185—
10 October 2026New buildMaroneia-Sapon199Residential
30 September 2026New buildMaroneia-Sapon177—
9 September 2026New buildMaroneia-Sapon169Residential
8 September 2026New buildMaroneia-Sapon1183Residential
7 September 2026New buildMaroneia-Sapon2345Residential, Retail and commerce
25 August 2026New buildMaroneia-Sapon143Residential
24 August 2026New buildMaroneia-Sapon253—
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

0 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Rhodope

Windows and doors

30 new builds and 5,147 m² of new floor area. Every one of them will need windows and doors.

All of Rhodope

Swimming pools

1 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Rhodope

Building materials

5,147 m² of new floor area in 30 permits: where cement, bricks and steel will be needed.

All of Rhodope

Electricians and solar

30 new builds and 85 small-scale works, from refurbishments to solar panels.

All of Rhodope

Frequently asked questions

How many new-build permits were issued in Maroneia-Sapon in 2026?

26 from 1 January to 13 November 2026. In the same period of 2025 there were 33, and 37 in the whole of 2025.

How many new apartment buildings are going up in Maroneia-Sapon?

In the past 12 months, 0 new-build permits were for buildings with three or more floors, 0 of them with four or more. We count the 30 of 30 permits that state the number of floors.

How does Maroneia-Sapon compare with other municipalities in Rhodope?

It ranks 2nd of 4 for new-build permits over the past 12 months, with 21% of the total. The top three are Komotini (89), Maroneia-Sapon (30), Iasmo (20).

How many new permits with a swimming pool were issued in Maroneia-Sapon?

1 in the past 12 months (new builds and small-scale works), 0 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Maroneia-Sapon for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Maroneia-Sapon was issued on 9 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Maroneia-Sapon: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy