Sketch map of Pieria

New builds in Katerini

205 new-build permits in Katerini in the past 12 months, 16 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

4 new buildings with four or more floors in Katerini in the last 30 days.

More than usual: the average over the past year was 2.2 a month.

Also

  • This month's largest new build in Katerini: 655 m² of new floor area, 5 floors.

    Permit issued on 6 November 2026, for housing.

The numbers in Katerini

New-build permits, 30 days
16
New-build permits, 12 months
205
New builds with 3+ floors
53
New permits with a pool
19
New floor area (m²)
54,007
Building permits, 7 days
18
Building permits, 30 days
106
Building permits, 12 months
1,741

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 15Nov2025Dec 2025: 16DecJan 2026: 18Jan2026Feb 2026: 10FebMar 2026: 17MarApr 2026: 11AprMay 2026: 19MayJun 2026: 21JunJul 2026: 2222JulAug 2026: 19AugSep 2026: 16SepOct 2026: 2121OctNov 2026: 6 (month to date)6Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds205
  • Small-scale works1,158
  • Revisions267
  • Pre-approvals111

What is being built in Katerini

Over the past 12 months, 205 new-build permits were issued in Katerini, out of 1,741 building permits of all types (including small-scale works, revisions and pre-approvals). That is 12% more than in the previous 12 months (183). Together they add 54,007 m² of new floor area (counting the 153 permits that state it).

36% of the new buildings have three or more floors. The average new build has 353 m² of new floor area and 2.4 floors, against 319 m² in Pieria. 3 of the new-build permits are for holiday accommodation (hotels, rooms to let). 16 include a swimming pool (8%).

Katerini accounts for 64% of new builds in Pieria and ranks 1st of 3 municipalities.

Where Katerini stands

#12 months30 days
1Katerini20516
2Dion-Olympos903
3Pydna-Kolindro232

The latest permits in Katerini

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
6 November 2026New buildKaterini5655Residential
6 November 2026New buildKaterini2134—
4 November 2026New buildKaterini4400Residential
3 November 2026New buildKaterini—1,460Public assembly, Storage
3 November 2026New buildKaterini2220Residential
3 November 2026New buildKaterini134Residential
28 October 2026New buildKaterini—74Residential
27 October 2026Pre-approvalKaterini2135Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

53 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Pieria

Windows and doors

205 new builds and 54,007 m² of new floor area. Every one of them will need windows and doors.

All of Pieria

Swimming pools

19 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Pieria

Building materials

54,007 m² of new floor area in 205 permits: where cement, bricks and steel will be needed.

All of Pieria

Electricians and solar

205 new builds and 1,158 small-scale works, from refurbishments to solar panels.

All of Pieria

Frequently asked questions

How many new-build permits were issued in Katerini in 2026?

180 from 1 January to 13 November 2026. In the same period of 2025 there were 158, and 183 in the whole of 2025.

How many new apartment buildings are going up in Katerini?

In the past 12 months, 53 new-build permits were for buildings with three or more floors, 26 of them with four or more. We count the 148 of 205 permits that state the number of floors.

How does Katerini compare with other municipalities in Pieria?

It ranks 1st of 3 for new-build permits over the past 12 months, with 64% of the total. The top three are Katerini (205), Dion-Olympos (90), Pydna-Kolindro (23).

How many new permits with a swimming pool were issued in Katerini?

19 in the past 12 months (new builds and small-scale works), 1 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Katerini for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Katerini was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Katerini: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy