90 new-build permits in Trifylia in the past 12 months, 4 in the last 30 days alone. With floor area, floors and uses straight from the permit.

Updated: (latest permit)

Live finding · 13 November 2026

Building permits of all types in Trifylia are up 53% on the same period last year.

29 permits between 13 October 2026 and 11 November 2026, against 19 in the same weeks a year earlier.

Also

  • 30% of new-build permits in Trifylia include a swimming pool.

    27 of 90 in the past 12 months.

  • Trifylia ranks 3rd out of 6 municipalities in Messenia for new-build permits over the past 12 months.

    90 permits, 17% of the total in Messenia.

The numbers in Trifylia

New-build permits, 30 days
4
New-build permits, 12 months
90
New builds with 3+ floors
2
New permits with a pool
34
New floor area (m²)
18,305
Building permits, 7 days
5
Building permits, 30 days
24
Building permits, 12 months
405

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 10Nov2025Dec 2025: 3DecJan 2026: 5Jan2026Feb 2026: 3FebMar 2026: 6MarApr 2026: 3AprMay 2026: 7MayJun 2026: 1616JunJul 2026: 10JulAug 2026: 14AugSep 2026: 7SepOct 2026: 55OctNov 2026: 2 (month to date)2Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds90
  • Small-scale works147
  • Revisions68
  • Pre-approvals100

What is being built in Trifylia

Over the past 12 months, 90 new-build permits were issued in Trifylia, out of 405 building permits of all types (including small-scale works, revisions and pre-approvals). That is 23% more than in the previous 12 months (73). Together they add 18,305 m² of new floor area (counting the 75 permits that state it).

Low-rise dominates: only 3% of the new buildings have three or more floors. The average new build has 244 m² of new floor area and 1.5 floors, against 274 m² in Messenia. 27 include a swimming pool (30%).

Trifylia accounts for 17% of new builds in Messenia and ranks 3rd of 6 municipalities.

Where Trifylia stands

#12 months30 days
1Kalamata18015
2West Mani13721
3Trifylia904
4Pylos-Nestor633

The latest permits in Trifylia

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
10 November 2026New buildTrifylia297Residential + pool
3 November 2026New buildTrifylia2284Residential + pool
30 October 2026Pre-approvalTrifylia2188Residential + pool
29 October 2026Pre-approvalTrifylia11,814Industry and manufacturing, Storage
26 October 2026New buildTrifylia1112Retail and commerce
26 October 2026Pre-approvalTrifylia289Residential
21 October 2026Pre-approvalTrifylia2196Residential
21 October 2026Pre-approvalTrifylia1—Pool
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

2 new buildings with three or more floors in the past year: the likeliest customers for a lift.

All of Messenia

Windows and doors

90 new builds and 18,305 m² of new floor area. Every one of them will need windows and doors.

All of Messenia

Swimming pools

34 new permits with a swimming pool in the past year, with the engineer who designed it.

All of Messenia

Building materials

18,305 m² of new floor area in 90 permits: where cement, bricks and steel will be needed.

All of Messenia

Electricians and solar

90 new builds and 147 small-scale works, from refurbishments to solar panels.

All of Messenia

Frequently asked questions

How many new-build permits were issued in Trifylia in 2026?

78 from 1 January to 13 November 2026. In the same period of 2025 there were 64, and 76 in the whole of 2025.

How many new apartment buildings are going up in Trifylia?

In the past 12 months, 2 new-build permits were for buildings with three or more floors, 0 of them with four or more. We count the 80 of 90 permits that state the number of floors.

How does Trifylia compare with other municipalities in Messenia?

It ranks 3rd of 6 for new-build permits over the past 12 months, with 17% of the total. The top three are Kalamata (180), West Mani (137), Trifylia (90).

How many new permits with a swimming pool were issued in Trifylia?

34 in the past 12 months (new builds and small-scale works), 2 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Trifylia for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Trifylia was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Trifylia: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy