Sketch map of Laconia

New floor area permitted in Laconia

For building-material suppliers: how much is being built, where and when, month by month.

Updated: (latest permit)

Live finding · 13 November 2026

56,348 m² of new floor area, past 12 months in Laconia.

New-build permits in Laconia added 56,348 m² of new floor area in the past 12 months, across 209 permits (158 of them state the area). The monthly chart below shows when the work comes in.

Also

  • Building permits of all types in Laconia are down 15% on the same period last year.

    90 permits between 13 October 2026 and 11 November 2026, against 106 in the same weeks a year earlier.

The numbers in Laconia

New-build permits, 30 days
18
New-build permits, 12 months
209
New builds with 3+ floors
14
New permits with a pool
25
New floor area (m²)
56,348
Building permits, 7 days
15
Building permits, 30 days
84
Building permits, 12 months
1,177

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 7Nov2025Dec 2025: 15DecJan 2026: 18Jan2026Feb 2026: 22FebMar 2026: 15MarApr 2026: 16AprMay 2026: 16MayJun 2026: 2727JunJul 2026: 25JulAug 2026: 10AugSep 2026: 18SepOct 2026: 1818OctNov 2026: 6 (month to date)6Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds209
  • Small-scale works613
  • Revisions242
  • Pre-approvals113

What is being built in Laconia

New-build permits in Laconia added 56,348 m² of new floor area in the past 12 months, across 209 permits (158 of them state the area). The monthly chart below shows when the work comes in.

Over the past 12 months, 209 new-build permits were issued in Laconia, out of 1,177 building permits of all types (including small-scale works, revisions and pre-approvals). That is 22% more than in the previous 12 months (171). Together they add 56,348 m² of new floor area (counting the 158 permits that state it).

Low-rise dominates: only 8% of the new buildings have three or more floors. The average new build has 357 m² of new floor area and 1.8 floors, against 322 m² in Greece as a whole. 4 of the new-build permits are for holiday accommodation (hotels, rooms to let). 5 include a swimming pool (2%).

Laconia accounts for 1% of all new builds in Greece and ranks 29th of 51 prefectures. The municipalities with the most new builds were Monemvasia (75), Anatoliki Mani (54) and Sparti (45).

Municipalities with the most new builds

#12 months30 days
1Monemvasia759
2Anatoliki Mani544
3Sparti452
4Evrota323
5Elafoniso30

The latest permits in Laconia

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
11 November 2026New buildSparti2108Residential
10 November 2026Pre-approvalAnatoliki Mani———
6 November 2026Pre-approvalSparti2174Residential
6 November 2026New buildEvrota2270Residential
5 November 2026New buildMonemvasia194Residential
3 November 2026Pre-approvalSparti21,000Industry and manufacturing
3 November 2026New buildMonemvasia—113—
3 November 2026New buildMonemvasia166Residential
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

14 new buildings with three or more floors in the past year: the likeliest customers for a lift.

See the sector

Windows and doors

209 new builds and 56,348 m² of new floor area. Every one of them will need windows and doors.

See the sector

Swimming pools

25 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Electricians and solar

209 new builds and 613 small-scale works, from refurbishments to solar panels.

See the sector

Frequently asked questions

How many new-build permits were issued in Laconia in 2026?

191 from 1 January to 13 November 2026. In the same period of 2025 there were 152, and 170 in the whole of 2025.

How many new apartment buildings are going up in Laconia?

In the past 12 months, 14 new-build permits were for buildings with three or more floors, 4 of them with four or more. We count the 179 of 209 permits that state the number of floors.

Which municipalities in Laconia have the most new builds?

Over the past 12 months: 1. Monemvasia (75), 2. Anatoliki Mani (54), 3. Sparti (45), 4. Evrota (32), 5. Elafoniso (3).

How many new permits with a swimming pool were issued in Laconia?

25 in the past 12 months (new builds and small-scale works), 1 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Laconia for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Laconia was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Laconia: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy