Sketch map of Heraklion

New buildings with three or more floors in Heraklion

For lift companies: every new build with three or more floors, as soon as its permit is issued, long before the shaft is built.

Updated: (latest permit)

Live finding · 13 November 2026

126 new buildings with 3+ floors, past 12 months in Heraklion.

In the past 12 months, 126 new-build permits in Heraklion were for buildings with three or more floors, 32 of them with four or more; 3 buildings with four or more floors were permitted in the last 30 days. The lift is decided during design, so the engineer on the permit is the person to talk to.

Also

  • New-build permits in Heraklion are down 18% on the same period last year.

    69 permits between 13 October 2026 and 11 November 2026, against 84 in the same weeks a year earlier.

  • This month's largest new build in Heraklion: 3,033 m² of new floor area, 7 floors in Heraklion.

    Permit issued on 31 October 2026.

The numbers in Heraklion

New-build permits, 30 days
68
New-build permits, 12 months
859
New builds with 3+ floors
126
New permits with a pool
315
New floor area (m²)
167,712
Building permits, 7 days
64
Building permits, 30 days
378
Building permits, 12 months
5,534

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 61Nov2025Dec 2025: 88DecJan 2026: 50Jan2026Feb 2026: 64FebMar 2026: 71MarApr 2026: 71AprMay 2026: 75MayJun 2026: 119119JunJul 2026: 76JulAug 2026: 47AugSep 2026: 64SepOct 2026: 8181OctNov 2026: 27 (month to date)27Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds859
  • Small-scale works3,238
  • Revisions937
  • Pre-approvals500

What is being built in Heraklion

In the past 12 months, 126 new-build permits in Heraklion were for buildings with three or more floors, 32 of them with four or more; 3 buildings with four or more floors were permitted in the last 30 days. The lift is decided during design, so the engineer on the permit is the person to talk to.

Over the past 12 months, 859 new-build permits were issued in Heraklion, out of 5,534 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (820). Together they add 167,712 m² of new floor area (counting the 717 permits that state it).

17% of the new buildings have three or more floors. The average new build has 234 m² of new floor area and 1.9 floors, against 322 m² in Greece as a whole. 23 of the new-build permits are for holiday accommodation (hotels, rooms to let). 226 include a swimming pool (26%).

Heraklion accounts for 4% of all new builds in Greece and ranks 4th of 51 prefectures. The municipalities with the most new builds were Heraklion (298), Hersonissos (157) and Phaistos (149).

Municipalities with the most new builds

#12 months30 days
1Heraklion29826
2Hersonissos15715
3Phaistos1499
4Malevizi12810
5Minoa Pediada475
6Gortyna321
7Archanon-Asterousion312
8Vianno170

The latest permits in Heraklion

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
12 November 2026New buildHeraklion189Residential
12 November 2026New buildArchanon-Asterousion1225Pool
12 November 2026New buildMalevizi3241Residential
12 November 2026Pre-approvalArchanon-Asterousion2235—
12 November 2026New buildGortyna195—
11 November 2026Pre-approvalArchanon-Asterousion1141—
11 November 2026New buildHeraklion2243Residential, Storage
11 November 2026New buildPhaistos2216Pool
address & engineer — in Bouldoza

Who it's for

Windows and doors

859 new builds and 167,712 m² of new floor area. Every one of them will need windows and doors.

See the sector

Swimming pools

315 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Building materials

167,712 m² of new floor area in 859 permits: where cement, bricks and steel will be needed.

See the sector

Electricians and solar

859 new builds and 3,238 small-scale works, from refurbishments to solar panels.

See the sector

Frequently asked questions

How many new-build permits were issued in Heraklion in 2026?

745 from 1 January to 13 November 2026. In the same period of 2025 there were 674, and 788 in the whole of 2025.

How many new apartment buildings are going up in Heraklion?

In the past 12 months, 126 new-build permits were for buildings with three or more floors, 32 of them with four or more. We count the 761 of 859 permits that state the number of floors.

Which municipalities in Heraklion have the most new builds?

Over the past 12 months: 1. Heraklion (298), 2. Hersonissos (157), 3. Phaistos (149), 4. Malevizi (128), 5. Minoa Pediada (47).

How many new permits with a swimming pool were issued in Heraklion?

315 in the past 12 months (new builds and small-scale works), 27 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Heraklion for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Heraklion was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Heraklion: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy