New builds in the Dodecanese for window and door makers
Window and door orders are placed months after the permit. Knowing the permit first gives you that head start.
Updated: (latest permit)
Live finding · 13 November 2026
410 new-build permits, past 12 months in the Dodecanese.
410 new-build permits were issued in the Dodecanese in the past 12 months, with 113,984 m² of new floor area, plus 682 revisions of existing permits. 27 new builds were added in the last 30 days.
Also
New-build permits in the Dodecanese are down 33% on the same period last year.
30 permits between 13 October 2026 and 11 November 2026, against 45 in the same weeks a year earlier.
This month's largest new build in the Dodecanese: 2,762 m² of new floor area, 2 floors in Kos.
Permit issued on 11 November 2026, for holiday accommodation, storage.
The numbers in the Dodecanese
- New-build permits, 30 days
- 27
- New-build permits, 12 months
- 410
- New builds with 3+ floors
- 34
- New permits with a pool
- 250
- New floor area (m²)
- 113,984
- Building permits, 7 days
- 72
- Building permits, 30 days
- 289
- Building permits, 12 months
- 3,331
12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.
By permit type, 12 months
- New builds410
- Small-scale works1,590
- Revisions682
- Pre-approvals649
What is being built in the Dodecanese
410 new-build permits were issued in the Dodecanese in the past 12 months, with 113,984 m² of new floor area, plus 682 revisions of existing permits. 27 new builds were added in the last 30 days.
Over the past 12 months, 410 new-build permits were issued in the Dodecanese, out of 3,331 building permits of all types (including small-scale works, revisions and pre-approvals). That is 17% fewer than in the previous 12 months (496). Together they add 113,984 m² of new floor area (counting the 330 permits that state it).
Low-rise dominates: only 9% of the new buildings have three or more floors. The average new build has 345 m² of new floor area and 1.8 floors, against 322 m² in Greece as a whole. 18 of the new-build permits are for holiday accommodation (hotels, rooms to let). 101 include a swimming pool (25%).
Dodecanese accounts for 2% of all new builds in Greece and ranks 13th of 51 prefectures. The municipalities with the most new builds were Rhodes (227), Kos (71) and Kalymnion (26).
The latest permits in the Dodecanese
The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.
Who it's for
Lifts and elevators
34 new buildings with three or more floors in the past year: the likeliest customers for a lift.
See the sectorSwimming pools
250 new permits with a swimming pool in the past year, with the engineer who designed it.
See the sectorBuilding materials
113,984 m² of new floor area in 410 permits: where cement, bricks and steel will be needed.
See the sectorElectricians and solar
410 new builds and 1,590 small-scale works, from refurbishments to solar panels.
See the sectorFrequently asked questions
How many new-build permits were issued in the Dodecanese in 2026?
- 342 from 1 January to 13 November 2026. In the same period of 2025 there were 405, and 473 in the whole of 2025.
How many new apartment buildings are going up in the Dodecanese?
- In the past 12 months, 34 new-build permits were for buildings with three or more floors, 2 of them with four or more. We count the 371 of 410 permits that state the number of floors.
Which municipalities in the Dodecanese have the most new builds?
- Over the past 12 months: 1. Rhodes (227), 2. Kos (71), 3. Kalymnion (26), 4. Karpatho (26), 5. Lero (15).
How many new permits with a swimming pool were issued in the Dodecanese?
- 250 in the past 12 months (new builds and small-scale works), 29 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.
Where can I see the address and the engineer for each permit?
- In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in the Dodecanese for free with the form on this page.
Where does the data come from and how often is it updated?
- From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in the Dodecanese was issued on 12 November 2026.
10 free permits for your area
Tell us what you do and we will email you the 10 most recent permits in the Dodecanese: what is being built, how many m², how many floors, exactly where and which engineer designed it.
One time, no subscription, no account needed.
Other municipalities in the Dodecanese
- Rhodes 227
- Kos 71
- Kalymnion 26
- Karpatho 26
- Lero 15
- Patmo 13
- Symi 8
- Astypalaia 6
- Megisti 6
- Nisyro 5
- Chalki 4
- Leipson 2
- Tilo 1
- Agathonisio 0
- Iroiki Niso Kaso 0
By sector in the Dodecanese
Prefectures with similar activity
All prefectures
- Aetolia-Acarnania
- Argolis
- Arcadia
- Arta
- Attica
- Achaea
- Boeotia
- Grevena
- Drama
- Dodecanese
- Evros
- Euboea
- Evrytania
- Zakynthos
- Elis
- Imathia
- Heraklion
- Thesprotia
- Thessaloniki
- Ioannina
- Kavala
- Karditsa
- Kastoria
- Corfu
- Kefalonia
- Kilkis
- Kozani
- Corinthia
- Cyclades
- Laconia
- Larissa
- Lasithi
- Lesbos
- Lefkada
- Magnesia
- Messenia
- Xanthi
- Pella
- Pieria
- Preveza
- Rethymno
- Rhodope
- Samos
- Serres
- Trikala
- Phthiotis
- Florina
- Phocis
- Chalkidiki
- Chania
- Chios
Source: e-Adeies permits published on Diavgeia, the Greek government transparency portal. Issue dates, Greek time. Floors and m² where the permit states them; pools only where explicitly mentioned.