Sketch map of Achaea

New builds and small works in Achaea for electricians

Every new build needs a full electrical installation, and many small-scale works (refurbishments, solar) need an electrician too.

Updated: (latest permit)

Live finding · 13 November 2026

3,674 new builds and small-scale works, past 12 months in Achaea.

499 new-build permits and 3,175 small-scale works permits were issued in Achaea in the past 12 months. The engineer named on each permit is usually the one who recommends trades to the owner.

Also

  • Building permits of all types in Achaea are down 17% on the same period last year.

    332 permits between 13 October 2026 and 11 November 2026, against 398 in the same weeks a year earlier.

  • This month's largest new build in Achaea: 4,765 m² of new floor area in Patras.

    Permit issued on 21 October 2026, for offices, storage, industry.

The numbers in Achaea

New-build permits, 30 days
42
New-build permits, 12 months
499
New builds with 3+ floors
121
New permits with a pool
50
New floor area (m²)
108,762
Building permits, 7 days
48
Building permits, 30 days
306
Building permits, 12 months
4,533

12 months unless stated. Building permits = new builds, small-scale works, revisions and pre-approvals.

Nov 2025: 45Nov2025Dec 2025: 44DecJan 2026: 37Jan2026Feb 2026: 29FebMar 2026: 34MarApr 2026: 38AprMay 2026: 44MayJun 2026: 6262JunJul 2026: 53JulAug 2026: 28AugSep 2026: 41SepOct 2026: 4444OctNov 2026: 19 (month to date)19Nov
New-build permits per month; the current month to date, lighter.

By permit type, 12 months

  • New builds499
  • Small-scale works3,175
  • Revisions739
  • Pre-approvals120

What is being built in Achaea

499 new-build permits and 3,175 small-scale works permits were issued in Achaea in the past 12 months. The engineer named on each permit is usually the one who recommends trades to the owner.

Over the past 12 months, 499 new-build permits were issued in Achaea, out of 4,533 building permits of all types (including small-scale works, revisions and pre-approvals). The pace is close to the previous 12 months (539). Together they add 108,762 m² of new floor area (counting the 408 permits that state it).

27% of the new buildings have three or more floors. The average new build has 267 m² of new floor area and 2.3 floors, against 322 m² in Greece as a whole. 5 of the new-build permits are for holiday accommodation (hotels, rooms to let). 28 include a swimming pool (6%).

Achaea accounts for 3% of all new builds in Greece and ranks 10th of 51 prefectures. The municipalities with the most new builds were Patras (319), Aigialeia (82) and West Achaea (71).

Municipalities with the most new builds

#12 months30 days
1Patras31930
2Aigialeia825
3West Achaea715
4Kalavryton152
5Erymantho120

The latest permits in Achaea

The most recent new-build permits and pre-approvals. Address, cadastral ID and engineers are inside Bouldoza.

Latest permits.xlsx
DateTypeMunicipalityFloorsm²UseAddress & engineer
12 November 2026New buildPatras5437—
12 November 2026New buildPatras4556Residential
11 November 2026New buildPatras26Residential
9 November 2026New buildPatras51,085Residential
9 November 2026New buildPatras1154—
9 November 2026Pre-approvalWest Achaea24,933—
9 November 2026New buildPatras—52Residential
7 November 2026New buildPatras339Residential, Storage
address & engineer — in Bouldoza

Who it's for

Lifts and elevators

121 new buildings with three or more floors in the past year: the likeliest customers for a lift.

See the sector

Windows and doors

499 new builds and 108,762 m² of new floor area. Every one of them will need windows and doors.

See the sector

Swimming pools

50 new permits with a swimming pool in the past year, with the engineer who designed it.

See the sector

Building materials

108,762 m² of new floor area in 499 permits: where cement, bricks and steel will be needed.

See the sector

Frequently asked questions

How many new-build permits were issued in Achaea in 2026?

429 from 1 January to 13 November 2026. In the same period of 2025 there were 469, and 539 in the whole of 2025.

How many new apartment buildings are going up in Achaea?

In the past 12 months, 121 new-build permits were for buildings with three or more floors, 74 of them with four or more. We count the 447 of 499 permits that state the number of floors.

Which municipalities in Achaea have the most new builds?

Over the past 12 months: 1. Patras (319), 2. Aigialeia (82), 3. West Achaea (71), 4. Kalavryton (15), 5. Erymantho (12).

How many new permits with a swimming pool were issued in Achaea?

50 in the past 12 months (new builds and small-scale works), 2 in the last 30 days. We only count permits that explicitly mention a pool, so the real number can only be higher.

Where can I see the address and the engineer for each permit?

In Bouldoza: every permit with its address, cadastral ID (KAEK), engineers and location on the map. You can ask for the latest 10 permits in Achaea for free with the form on this page.

Where does the data come from and how often is it updated?

From the e-Adeies building permit system, as published on Diavgeia, the Greek government transparency portal. This page updates itself several times a day; the latest permit in Achaea was issued on 12 November 2026.

10 free permits for your area

Tell us what you do and we will email you the 10 most recent permits in Achaea: what is being built, how many m², how many floors, exactly where and which engineer designed it.

One time, no subscription, no account needed.

We use your details only to send you the permits and reply to you. You are not added to any mailing list. Privacy